8  Validate ToR output power or go to step 9. 
Connect the General Dynamics R2660 Series Communication System Analyzer to 
the top of the rack Tx OUT 1. Then set up the R2660 for iDEN Base mode. Enter 
the control channel frequency for sector 1, and then measure the output power of 
that frequency.  
For specifications, refer to section 2.5.8.2 “Transmitter Performance Summary”. 
The default is +29 dBm per carrier, assuming that the datafill parameter 
defaultTxPower is set to 9.5. If necessary, adjust the datafill parameter (refer to 
section 6.1.4.1 “defaultTxPower”).  
9  Measure the SQE and frequency error for the control channel to see if they are 
within specifications.  
10 Verify that all BRs have the same output power.  
For each channel, enter the frequency into the R2660 and verify that the SQE, 
frequency error, and power level are all within specifications (refer to Table 17 
“Receiver Performance Summary” on page 36). 
11 Repeat steps 5 through 10 as needed for each sector. 
12 Review the Active Alarm Manager for any un-cleared alarms. 
Refer to section 7.5.3 “System Manager Alarms” for more information.  
5.5  Functionality Test 
RadioFrame Networks recommends that a certification process be completed to ensure 
proper operational performance and to verify the integrity of the following services:  
•  Voice quality for 3:1 Interconnect Voice 
•  Voice quality for 6:1 Private Group Dispatch Voice 
•  Call setup reliability for 3:1 Interconnect Voice 
•  Call setup reliability for 6:1 Private and Group Dispatch Voice 
•  Call stability for all of the above voice services 
•  Connection quality, stability, delay and perceived throughput for the Packet Data 
service 
•  Connection setup reliability for Packet Data 
•  Idle SQE quality and variation 
•  Call up SQE quality and variation 
•  Short Message Service 
•  Handover and cell reselection 
•  Performance will also be validated by collecting at least one week of performance 
statistical data 
Refer to Appendix D “Functionality Test Procedures” for procedures to conduct 
functionality testing. 
Note:  MC-Series High-Power system does not support 6:1 VSELP calls or Circuit-
Switched data.