Radwin Ltd. 5XACMOD3C User Manual
FinM Deployment Guide
Release 4.5.10
4‐6
Project Tab
Configuring the Radio Network
Figure 4‐3: Configurator ‐ Project tab, upper table
Band:
Click this pull‐down menu to choose the frequency band to be
used for the project. Only those bands that are in accordance
with your regulatory environment will appear.
used for the project. Only those bands that are in accordance
with your regulatory environment will appear.
Channel Bandwidth:
Click this pull‐down menu to choose the bandwidth to be used
for this project. The frequencies used in the Tower tab (F1, F2,
F3, etc) will be the base frequency chosen in Band, with the
bandwidth added.
for this project. The frequencies used in the Tower tab (F1, F2,
F3, etc) will be the base frequency chosen in Band, with the
bandwidth added.
Note that not all frequency bands allow all bandwidths to be
used.
used.
Synchronization:
Click this pull‐down menu to choose the type of synchronization
used in this project:
used in this project:
Integrated GPS: Use a GPS unit integrated in the TBS. Used in
above ground scenarios.
above ground scenarios.
GSU: Use an external GPS unit. Used in above ground scenarios.
Note that this requires extra installation and configuration for
the GSU.
Note that this requires extra installation and configuration for
the GSU.