Radwin Ltd. 5XACMOD3C User Manual

Page of 122
FinM Deployment Guide
Release 4.5.10
4‐6
Project Tab
Configuring the Radio Network
 
Figure 4‐3: Configurator ‐ Project tab, upper table
Band: 
Click this pull‐down menu to choose the frequency band to be 
used for the project. Only those bands that are in accordance 
with your regulatory environment will appear. 
Channel Bandwidth:
Click this pull‐down menu to choose the bandwidth to be used 
for this project. The frequencies used in the Tower tab (F1, F2, 
F3, etc) will be the base frequency chosen in Band, with the 
bandwidth added. 
Note that not all frequency bands allow all bandwidths to be 
used. 
Synchronization:
Click this pull‐down menu to choose the type of synchronization 
used in this project: 
Integrated GPS: Use a GPS unit integrated in the TBS. Used in 
above ground scenarios.
GSU: Use an external GPS unit. Used in above ground scenarios. 
Note that this requires extra installation and configuration for 
the GSU.