Radwin Ltd. WINLINK User Manual

Page of 65
 
Installing AirMux-104 Units 
Quick Start Guide 
 
Installation of AirMux-104 should be carried out only by an experienced 
technician. If you are familiar with AirMux-104, use this guide to prepare the units 
for operation. 
1.  Installing AirMux-104 Units 
Performing Initial Setup 
 
To perform initial setup: 
1.  Install and run the AirMux-104 management software on the network 
management station. 
2.  Prepare the 2m RT-to-RTCB configuration cable for initial setup. 
3.  Connect the first RTCB to its RT using the 2m configuration cable. 
4.  Power up the first RTCB. 
5.  Connect management station to the first RTCB. 
6.  Perform initial configuration of AirMux-104 and download the new parameters 
to the first unit. 
7.  Disconnect the configuration cable from the first RTSB and its RT. 
8.  Connect the second RTCB to its RT using the 2m configuration cable. 
9.  Connect the network management station to the second RTCB.  
10. Download the new parameters to the second AirMux-104. 
Performing Outdoor Installation 
 
To install the RT: 
1.  Route the RT cable from the RT location (on the roof) to the RTCB location 
(inside the building).  
2.  Attach the RT unit to the mast, using the two strap clamps. 
3.  Use the RT cable to connect the RTCB to the RT. 
4.  Secure the RT and ground cables to the mast or brackets using provided 
UV-rated cable ties. 
5.  Repeat the procedure at the remote site.