ZTE Corporation BTSBI119 User Manual
Preface
About This Manual
This manual introduces the hardware installation flow and method of the ZXC10
BTSB I1.
It is one of the manuals of the CDMA cellular mobile communication system of ZTE.
This manual is intended to provide basic installation operation guide to the engineering
staff that install the ZXC10 BTSB I1 of ZTE. Operation and maintenance staff of the
equipment can also use it as reference.
Standardized hardware installation is the basis for the normal and stable operation of
the BS and is thus important in the project engineering. To guide the hardware
installation of ZXC10 BTSB I1, this manual is arranged in the order of engineering
installation. This manual first briefs the equipment composition, which enables the
engineering staff to have an overall understanding of the ZXC10 BTSB I1 of ZTE.
Then it details the installation flow of the equipment and the installation check.
How to Use This Manual
This manual comprises 15 chapters:
Chapter 1 Installation Overview briefs the equipment installation and commissioning
flow, the hardware installation flow and the hardware installation precautions for the
BTSB system.
Chapter 2 Installation Preparations introduces the preparations prior to the BTSB
installation, including installation environment check, and preparation for tools,
instruments and technical documentation.
Chapter 3 Unpacking and Acceptance describes unpacking, acceptance and handover
of the goods.
Chapter 4 Cabinet Installation describes the installation of the BTSB cabinet, and the
layout, connection and fixing of multiple cabinets.
Chapter 5 Power System Installation describes the installation procedure of the
BTSB power system.