ZTE Corporation BTSBI119 Manuale Utente

Pagina di 227
 
Preface 
About This Manual 
This manual introduces the hardware installation flow and method of the ZXC10 
BTSB I1. 
It is one of the manuals of the CDMA cellular mobile communication system of ZTE. 
This manual is intended to provide basic installation operation guide to the engineering 
staff that install the ZXC10 BTSB I1 of ZTE. Operation and maintenance staff of the 
equipment can also use it as reference. 
Standardized hardware installation is the basis for the normal and stable operation of 
the BS and is thus important in the project engineering. To guide the hardware 
installation of ZXC10 BTSB I1, this manual is arranged in the order of engineering 
installation. This manual first briefs the equipment composition, which enables the 
engineering staff to have an overall understanding of the ZXC10 BTSB I1 of ZTE. 
Then it details the installation flow of the equipment and the installation check. 
How to Use This Manual 
This manual comprises 15 chapters: 
Chapter 1 Installation Overview briefs the equipment installation and commissioning 
flow, the hardware installation flow and the hardware installation precautions for the 
BTSB system. 
Chapter 2 Installation Preparations introduces the preparations prior to the BTSB 
installation, including installation environment check, and preparation for tools, 
instruments and technical documentation.   
Chapter 3 Unpacking and Acceptance describes unpacking, acceptance and handover 
of the goods. 
Chapter 4 Cabinet Installation describes the installation of the BTSB cabinet, and the 
layout, connection and fixing of multiple cabinets. 
Chapter 5 Power System Installation describes the installation procedure of the 
BTSB power system.