Objective
The objective of this procedure is to install the 120 degree BTS transmit
path cabling.
path cabling.
Cable Labels
The cable designations are referenced to Table 2-1 in the “Cabling
Diagrams and Description” area. Table 2-26 and Table 2-27 provide the
quantities and descriptions of the cables required for this procedure.
Diagrams and Description” area. Table 2-26 and Table 2-27 provide the
quantities and descriptions of the cables required for this procedure.
Cabling Diagram
Figure 2-15 and Figure 2-16 shows both inside and outside cable
connections for 3 Sector direct connect configurations. Table 2-26 and
Table 2-27, describes the antenna cable connection ports.
connections for 3 Sector direct connect configurations. Table 2-26 and
Table 2-27, describes the antenna cable connection ports.
Figure 2-15: 120 Degree Sector (3 Sector) Transmit Path Cabling Details (outside the frame)
LIGHTNING
ARRESTOR
ANTENNA
G
DIRECT CONNECTION
ti-CDMA-WP-00050-v04-ildoc-ftw
TX OUT
1
2
3
4
5
6
7
8
9
10
11 12
I/O PLATE
S1 C1–C4
S2 C1–C4
S3 C1–C4