Hughes Network Systems 24HX-001 User Manual

Page of 179
1027145 – 0001  Revision E
Installing indoor hub equipment   6–39
Hub installation
Serial port 2 test
SUDS  Ser 2 Test
Serial port 2 is tested.
LAN ID test
SUDS LAN ID Test
LAN PCI registers are
configured and the LAN ID
is read from the LAN
controller.
Successful test completion
This message indicates that startup diagnostics have
successfully completed:
SUDS  Completed
Failure indication
If a failure occurs during any of the tests listed above,
the LCD message sequence stops.
 The LCD shows the test
that failed on the first line and 
FAILED
 (flashing) on the
second line, as in the example below.
SUDS  Ser 2 Test
FAILED
This screen indicates that
serial port 2 failed
diagnostics. 
The LCD remains inactive unless you power the CCM off,
then on. This restarts SUDS.
If any CCM component fails, replace the CCM.
After SUDS are complete, the LCD displays the CCM boot
up sequence. At this point, you only need to verify that
SUDS have completed.
The AIReach Broadband hub LAN uses a Cisco 2611 (DC)
modular router and a Cisco 1924 (DC) Ethernet hub switch, which
connects to the router.
For installation and configuration information, refer to the Cisco
documentation. (The router must be configured for EMS–hub
communication.)
For detailed specifications, see the Hub and Remote Terminal Site
Preparation Guide
 or the Cisco documentation.
6.10
Hub LAN router and
LAN hub