Testing, Troubleshooting, and Maintenance
SENTINEL Meter Technical Reference Guide
7-7
Demand Test Method
1
Connect the meter under test and the reference standard in the same circuit 
with all voltage coils in parallel and current coils in series as per standard 
meter testing procedures (Figure 7.3).
Figure 7.3 Test Connections
2
Apply rated voltage to the meter under test and the reference standard. Set the 
test current to the desired level (FL, LL, or PF test amps or any desired level 
within the meter rating). To ensure that the supply polarities are correct, check 
that the Load Emulation Annunciator is traversing in the forward direction. 
Switch off only the current to both the meter and the standard.
3
Reset and enable the pulse counting device.
4
Put the SENTINEL meter into Test Mode by pressing the Test switch. Once this 
has been done, push in the Demand Reset switch to zero the test registers and 
start a new demand interval.
5
Start the test by switching on the current to all meters and the reference 
simultaneously.
6
The End-of-Interval (EOI) flag will appear for five seconds in the display after 
the end of the demand interval. At this time, switch off the current to all meters 
simultaneously and stop the pulse count. Do not disconnect the voltage to the 
meter.
7
Record the pulse counter total and the values displayed on the SENTINEL 
meter.
Table 7.2 Meter Singlephase Test Constants (SPTC)
Form
Series
A Phase Only
B Phase Only
C Phase Only
45 or 12
3Ø, 3W, 
0.866
0.866
.866
46
1
1
2 1/2 Element Meter
3Ø, 4W,wye
1
1
1
1
9 or 16
3Ø, 3W, 
0.911
.866
.0866
1
9, 16, or 14
3Ø, 4W, wye
1
1
1
1
45 or 12
3Ø, 3W, wye
1
1
1