Digital Monitoring Products Inc PC0199 User Manual

Page of 28
XTLtouch Installation Guide    |    Digital Monitoring Products  
12
2
Install the Backbox
1. 
Route the 22 AWG wires through the bottom slot in the backbox. 
2.  Place the backbox in the wall space you created with the locking tabs 
in a vertical position. See Figure 9.
Vertical Locking 
Tab
Figure 9: Placing the Backbox in the Wall