Fibar Group S.A. FGS223 User Manual
7
InSTAllATIOn
Installation of the Switch 2:
1. Switch off the mains voltage (disable the fuse).
2. Open the wall switch box.
3. Connect with one of following the diagrams for appropriate
1. Switch off the mains voltage (disable the fuse).
2. Open the wall switch box.
3. Connect with one of following the diagrams for appropriate
device:
single switch
double switch
Wiring diagrams - Single Switch 2
NOTE
Switch connected to
the S1 terminal is a
master switch. It acti-
vates the basic func-
tionality of the device
(turning the first load
on/off) and activates
the learning mode
(adding/removing).
The switch connect-
ed to the S2 ter-
minal turns on/of
the second load in
Double Switch 2,
but is optional in
Single Switch 2 and
pushing it will not af-
fect the status of the
device.
i
B
Q1
L
N
S1 S2 L
L
N
N
B
Q1
L
N
S1 S2 L
L
N
N
SINGLE
SWITCH 2
FGS-213
SINGLE
SWITCH 2
FGS-213
single switch
double switch
Wiring diagrams - Double Switch 2
B
Q1
L
N
S1 S2 Q2
L
N
N
B
Q1
L
N
S1 S2 Q2
L
N
N
DOUBLE
SWITCH 2
FGS-223
DOUBLE
SWITCH 2
FGS-223
4. After verifying correctness of the connection switch on the mains
voltage.
5. Add the device to the Z-Wave network (see “Adding/removing the
6. Turn off the mains voltage, then arrange the device and its anten-
na in a wall switch box.
7. Close the wall switch box and turn on the mains voltage.
NOTE
After switching on the
mains voltage lED
indicator will signal
Z-Wave network in-
clusion state with a
colour:
GREEN - device added
RED - device not added
i