Fibar Group S.A. FGS223 User Manual

Page of 26
7
InSTAllATIOn
Installation of the Switch 2:
1.  Switch off the mains voltage (disable the fuse).
2.  Open the wall switch box.
3.  Connect with one of following the diagrams for appropriate  
device:
single switch
double switch
Wiring diagrams - Single Switch 2
NOTE
Switch connected to 
the S1 terminal is a 
master switch. It acti-
vates the basic func-
tionality of the device 
(turning the first load 
on/off) and activates 
the learning mode 
(adding/removing). 
The switch connect-
ed to the S2 ter-
minal turns on/of 
the second load in 
 
Double Switch 2, 
but is optional in 
 
Single Switch 2 and 
pushing it will not af-
fect the status of the 
device. 
i
B
Q1
L
N
S1 S2 L
L
N
B
Q1
L
N
S1 S2 L
L
N
SINGLE
SWITCH 2
FGS-213
SINGLE
SWITCH 2
FGS-213
single switch
double switch
Wiring diagrams - Double Switch 2
B
Q1
L
N
S1 S2 Q2
L
N
B
Q1
L
N
S1 S2 Q2
L
N
DOUBLE
SWITCH 2
FGS-223
DOUBLE
SWITCH 2
FGS-223
4.  After verifying correctness of  the connection switch on the mains 
voltage.
5.  Add the device to the Z-Wave network (see “Adding/removing the 
6.  Turn off the mains voltage, then arrange the device and its anten-
na in a wall switch box.
7.  Close the wall switch box and turn on the mains voltage.
NOTE
After switching on the 
mains voltage lED 
indicator will signal 
Z-Wave network in-
clusion state with a 
colour:
GREEN - device added
RED - device not added
i