Panduit 1167 User Manual

Page of 40
SynapSense
® 
2.4GHz Industrial Gateway 
Installation Manual 
 
19 
 
 
Installation Preparations 
 
 
Follow the activities in Table 3 to prepare for the Industrial Gateway installation. 
Table 3 – Installation Preparation Activities 
 
 
Activity 
 
Steps 
Unpack Kits  Unpack the Industrial Gateway and accessories from boxes. 
 
Count and verify any other cables/accessories need for job. 
 
Verify that you have all necessary tools (in pocket or bag), small 
garbage bag, headlight, heat shrink, alcohol wipes, gloves, etc. 
Plan and 
Verify Power 
Source 
Verify that the planned source of Gateway power(one or both 
potential sources) is available and check power supplies before 
connecting Industrial Gateway to power source. Use a PoE camera 
or other PoE device, to test PoE source power to be connected to 
the Industrial Gateway. 
 
Verify Static IP  Verify the plant or data center IT provided one static IP address per 
Industrial Gateway. 
  Plan and 
Verify 
Ethernet 
Connection 
Verify the plant or data center provided one Ethernet cable/connection 
per Industrial Gateway near the planned installation location. 
 
 
Industrial Gateway Installation 
 
For each Industrial Gateway, the following installation procedures must be performed: 
 
1.  Configure the Industrial Gateway 
2.  Mount the Industrial Gateway & Connect Cables and External Dipole Antenna 
 
NOTE: To save time, it is best to configure all Industrial 
Gateway(s) first, and then mount the Industrial Gateway(s) in the 
planned location in the plant or data center.