NEOSEN ENERGY EZI User Manual

Page of 8
required the installation should be done in the fabrication shop prior to sheet 
installation. 
The EZI/STD Charging Unit – Individual package consists of the transmitter, 
power cord and transformer. PMA-compliant charging rings are available 
separately in packs of three: one ring each of micro USB, Apple 30-pin and 
Apple Lightning® PMA compatible receivers. 
The transmitter has a micro USB port for updating the firmware if necessary. 
A. PREPLANNING 
A.1. Box Contents 
The box will come with the transmitter and the power supply (not pictured 
here). 
A.3. Placement 
There are several considerations regarding proper placement of the transmitter: 
Avoid putting in proximity to locations where the device being charged 
may get wet, exposed to excessive heat or any other conditions which 
may damage the device being charged. 

Do not install next to heat sources (such as stoves) or where heat sources 
are commonly used (toasters, hot plates, etc.). 

Stay away from edges where charging devices can be easily knocked off 
the surface. 

Work with the customer to determine convenient locations. 
Page 1 of 4 
 
EZI/STD
 
CHARGING UNIT – INSTALLATION 
The transmitter requires a rectangular space of 82 mm x

92 mm (3.23"x 3.60") below the surface counter. Allow an extra 25 mm (1") 
distance to any support structure. No metal should be between the transmitter 
and the surface. The transmitter also requires 36 mm (1 
7
/
16
") vertical clearance 
measured from the top surface (24 mm (0.94") from bottom surface). Avoid 
placement above heat- or moisture-generating appliances such as dishwashers,