NEOSEN ENERGY NEO-0002 User Manual

Page of 4
All rights reserved by Neosen Energy LLC, 2016
Step 6/7
Secure the mounting plate to the substrate with three no.6 screws (provided). Ensure
that the screws do not penetrate the substrate surface.
Step 7/7
Place the decal directly on top of where the charger was installed to mark the
designated charging area.
Optional
Zip ties can be applied at three (3) points on the mounting plate to tether excess cable
to the device (see arrows above).