Cisco T3 kit CAB-T3-KIT5= User Manual

Product codes
CAB-T3-KIT5=
Page of 28
Page 9 of 28
78-19803-02 Cisco TelePresence System T3 System Assembly Guide, December  2011
Leveling the systems
1.
In order to level the systems, use 4 pcs of the M10×30 
screw in the holes marked in the picture below for 
each bottom module. Loosen nuts before adjusting 
the pin bolts down. When proper adjustment has been 
done, tighten nuts again. You may want to open the lid 
completely when doing this—observe the tip on page 
15.
2.
Unpack the 2 angle plates and the 8 nut plate for angle 
plates from the box marked “T3 Floor structure and 
columns”. Fasten with M4 × 14 screws through the holes 
on top side on the monitors and with  M4 ×40 screws 
and washers through the holes of the bottom modules. 
Use the short screw at the monitor top and the long 
screw at the bottom module top. Use the shims plates 
inside the angle plate. Note that the top cover and the 
door must be opened in order to do so.
Bottom 
module
Table columns installation
1.
Remove the door of the table column while the column 
is still in the box. Then take the column out of the 
box. Remove the cover as shown below. The column 
covers and the doors shall not be mounted yet, so we 
recommend that you put them in a place where they 
will not become subject to damage.
The columns are not identical, place the one marked 
left to the left and the one marked right to the right. See 
the following page for a definition of left and right.
2.
Mount the columns using 12 × nut M8 (Captive washer 
nut) for each column (24 altogether). 
Keys for the door locks can be found in the protective foam 
in the table column box.