Toshiba Strata DK Admin User Manual

Page of 178
Upgrade
––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––––
110
DKAdmin/DKBackup
8. Press 
Enter
 and then select the processor type you are upgrading to; press 
Enter
 after 
selecting the processor (RDTU E/F, Release 3 in this example).
9. If you haven’t backed up the customer database by downloading the original RCTU, 
answer 
Yes
 to 
Backup From DK First
; otherwise, answer 
No
. Press the spacebar to 
make your selection and then press 
Enter
.
10. From the screen in 
Step 7
 above, use the spacebar to change 
Backup From DK First
 
from 
No
 to 
Yes
 to download the database from the original processor and press 
Enter
.
Note
If you already completed a backup and have a spare customer database for the original 
processor, you can answer 
No
 to the prompt: 
Backup from DK First
DKAdmin/DKBackup upgrades the database files and displays the screen shown in 
Step 13
Steps 11
 and 
12
 are skipped.
You are prompted with the message 
Upgrading to DK RCTU EF, R3. Are you 
sure?
 This database is then upgraded before sending it to the “new” processor
11. Use the arrow keys to highlight 
Yes
 and press 
Enter
. You are now prompted with 
You 
will receive data FROM the DK. Are you sure?
12. Highlight 
Yes
 and press 
Enter
. DKAdmin/DKBackup downloads the following files: 
PRGALL, REPALL, NAMEALL, VIDALL, ADMEMOAL, MSGALL, CFALL
(Release 3), MWALL (Release 3), CLID (Release 3). DKAdmin/DKBackup then 
upgrades and builds the database. After upgrading the database, the screen in 
Step 13
 
displays.
13. At this point DKAdmin/DKBackup has upgraded the customer database; follow the 
instructions on the screens below to change ROMs/Flash Memory on processors and add 
cabinets and PCBs as required.
Important!
Remember to turn power off before changing PCBs and cabinets. Then turn the 
system back on and perform the steps on the screen below to ensure the 
DKBackup and DK system TTY port communication link continues to function 
during the remaining upgrade process.
Processor Conversion
PLEASE READ THE FOLLOWING SCREENS AS THEY PROVIDE VERY IMPORTANT 
INFORMATION REGARDING THE UPGRADE AND INITIALIZATION PROCESSES.
Please turn DK system power off and add/change cabinets, processor ROM or 
RMSS memory and/or RCTU PCBs as required.
IMPORTANT: Do not add PCBs, other than RSIU or PIOU in between existing 
PCBs at this time as they will make station port and/or CO line numbers 
shift causing the upgraded data to be invalid.
The next screen provides step-by-step instructions for initializing the 
system.
Press any key to Continue
Get user manuals: 
See SafeManuals.com