Panasonic CU-RE9JKX User Manual

Page of 51
27
t
u
c
o
T
.
1
e
h
t
f
o
e
c
a
f
r
u
s
l
a
n
r
e
t
n
i
e
h
t
,
d
e
r
a
l
f
y
l
r
e
p
o
r
p
n
e
h
W
.
s
s
e
n
k
c
i
h
t
n
e
v
e
f
o
e
b
d
n
a
e
n
i
h
s
y
l
n
e
v
e
ll
i
w
e
r
a
l
f
e
h
t
h
t
i
w
t
c
a
t
n
o
c
o
t
n
i
s
e
m
o
c
t
r
a
p
e
r
a
l
f
e
h
t
e
c
n
i
S
.
h
s
i
n
i
f
e
r
a
l
f
e
h
t
k
c
e
h
c
y
ll
u
f
e
r
a
c
,
s
n
o
i
t
c
e
n
n
o
c
g
n
i
r
a
l
f
r
e
p
o
r
p
m
I
e
c
a
f
r
u
S
d
e
n
il
c
n
I
d
e
g
a
m
a
d
n
e
v
e
n
U
d
e
k
c
a
r
C
s
s
e
n
k
c
i
h
t
e
r
a
l
f
o
T
.
3
r
a
B
k
r
a
m
w
o
r
r
a
d
e
R
e
l
d
n
a
H
e
r
o
C
e
k
o
Y
e
l
d
n
a
h
p
m
a
l
C
r
a
B
m
m
5
.
0
0
e
p
i
p
r
e
p
p
o
C
r
e
m
a
e
R
s
r
r
u
b
e
v
o
m
e
r
o
T
.
2
n
w
o
d
t
n
i
o
P
e
p
i
P
10.3.2.2 
Cutting and flaring the piping 
Please cut using pipe cutter and then remove the burrs. 
Remove the burrs by using reamer. If burrs are not removed, gas leakage may be caused. Turn the piping 
end down to avoid the metal powder entering the pipe. 
Please make flare after inserting the flare nut onto the copper pipes. 
10.3.3  Evacuation of the equipment 
When installing an air conditioner, be sure to evacuate the air inside the indoor unit and pipes in the follwing 
procidure. 
Connect a charging hose with a push pin to the low side of a charging set and the service port at the 3-way 
valve.
z  Be sure to connect the end of charging hose with the push pin to the service port. 
z  The size of charging hose fitting should be 1/2 UNF, 20 threads. 
Connect the center hose of the charging set to a vacuum pump with check valve, or vacuum pump and 
vacuum pump adaptor. 
Turn on the power switch of the vacuum pump and make sure that the needle in the gauge moves from 0 
cmHg (0 Mpa) to –76 cmHg (-0.1 Mpa). Then evacuate the air approximately ten minutes. 
Close the Low side valve of the charging set and turn off the vacuum pump. Make sure that the needle in the 
gauge does not move after approximately five minutes. 
Note: BE SURE TO FOLLOW THIS PROCEDURE IN ORDER TO AVOID REFRIGEANT GAS LEAKAG 
Disconnect the charging horse from the vacuum pump and from the service port of the 3-way valve. 
Tighten the service port caps of the 3-way valve at a torque of 18 N.m with a torque wrench. 
Remove the valve caps of both of the 2-way valve and 3-way valve. Position both of the valves to “OPEN” 
using a hexagonal wrench (4mm). 
Mount valve caps onto the 2-way and the 3-way valve. 
z  Be sure to check for gas leakage. 
CAUTION:   
ƽ If gauge needle does not move from  0 cmHg (0 MPa) to -76 cmHg (-0.1 MPa), in step 3 above take the following 
measure:
ƽ If the leak stops when the piping connections are tightened further, continue working from step 3. 
ƽ If the leak does not stop when the connections are retightened, repair the location of leak. 
ƽ Do not release refrigerant during piping work for installation and reinstallation. Take care of the liquid refrigerant, 
it may cause frostbite. 
Control board cover
Terminal board
Over 5mm
To indoor unit
Liquid side
Gas side
2-way valve
(Open)
Cap
3-way valve (Open)
Hexagonal wrench
Service port cap
Outdoor Unit