Gw Instek GPT-9802 Insulation measuring device, GPT-9802 User Manual
Product codes
GPT-9802
GPT-9000 Series User Manual
90
5. The TEST indicator will be lit
orange when in the TEST status.
TEST
6. Each test will start by showing the remaining
ramp up time, followed by the remaining test
time. Each test will be tested in sequence until
the last test has finished or the test is stopped.
time. Each test will be tested in sequence until
the last test has finished or the test is stopped.
I R
G B
A CW
D CW
F R E Q =
0 H z
6
0
100
k
V
R
A C
=
F F
O
S
E
T
M
T I
E
= 0 0 3 . 2 S
R
0 0 m A
E
R F
=
#
0 .
0
1 . 0 0 m A
I
H
E
S
= 0
T
0 0 . 1 S
0
A M P
=
R
T
remaining TIMER time
00 37
m
A
remaining RAMP time
E
M
A U O
T
N A
_
1
A U T O = 0 0 1 - 0 0
PASS/FAIL HOLD
1. If Pass Hold or Fail Hold is set to ON for a
manual test, then the tester will “hold” the
testing after a Pass/Fail result for that
particular test. See page 48, 50 for details.
testing after a Pass/Fail result for that
particular test. See page 48, 50 for details.
I R
G B
A CW
D CW
F R E Q =
0 H z
6
0
100
k
V
R
A C
=
F F
O
L
O
H
M
T I
E
= 0 0 3 . 2 S
R
0 0 m A
E
R F
=
#
0 .
0
1 . 0 0 m A
I
H
E
S
= 0
T
0 0 . 1 S
0
A M P
=
R
D
00 37
m
A
E
M
A U O
T
N A
_
1
A U T O = 0 0 1 - 0 0
HOLD status
2. The PASS or FAIL indicator will
also be lit. The buzzer will NOT
sound.
sound.
PASS
FAIL
3. To continue to the next test after
HOLD is displayed on-screen,
press the START button.
press the START button.
START