Gw Instek GPT-9802 Insulation measuring device, GPT-9802 Manuale Utente

Codici prodotto
GPT-9802
Pagina di 156
 
 
GPT-9000 Series User Manual 
90
 
 
5.  The TEST indicator will be lit 
orange when in the TEST status. 
TEST
 
 
6.  Each test will start by showing the remaining 
ramp up time, followed by the remaining test 
time. Each test will be tested in sequence until 
the last test has finished or the test is stopped.  
 
I R  
G B  
A CW
D CW
 
 
 
F R E Q =  
0 H z  
6
0
   
100
k
 
V
 
       
R
A C
 
=
F F
O
S
E
T
 
                         
M
T I
E
= 0 0 3 . 2 S
R
0 0 m A
E
R F
=
#
0 .
0
1 . 0 0 m A
I
H
E
S
= 0
T
0 0 . 1 S
0
A M P
=
R
 
 
T
remaining TIMER time
00 37
m
 
A
 
remaining RAMP    time
E        
 
M
A U O
T
N A
_
 
1
A U T O = 0 0 1 - 0 0
 
PASS/FAIL HOLD 
1.  If Pass Hold or Fail Hold is set to ON for a 
manual test, then the tester will “hold” the 
testing after a Pass/Fail result for that 
particular test. See page 48, 50 for details. 
 
I R  
G B  
A CW
D CW
 
 
 
F R E Q =  
0 H z  
6
0
   
100
k
 
V
 
       
R
A C
 
=
F F
O
L
O
H
 
                         
M
T I
E
= 0 0 3 . 2 S
R
0 0 m A
E
R F
=
#
0 .
0
1 . 0 0 m A
I
H
E
S
= 0
T
0 0 . 1 S
0
A M P
=
R
 
 
D
00 37
m
 
A
 
E        
 
M
A U O
T
N A
_
 
1
A U T O = 0 0 1 - 0 0
HOLD status
 
 
2.  The PASS or FAIL indicator will 
also be lit. The buzzer will NOT 
sound. 
PASS
FAIL
 
 
3.  To continue to the next test after 
HOLD is displayed on-screen, 
press the START button.   
START