Novatek THREE-PHASE POWER LIMITER OM-310 OM-310 Data Sheet

Product codes
OM-310
Page of 28
- 15 - 
NOVATEK-ELECTRO
                                                                                                                                                       
ОМ-310
 
While in Service Engineer access mode, any additional parameter can be added to the MMSP parameter regis-
ter. Action: 
 
 - with DOWN and UP buttons choose  the parameter to be added; 
 - push buttons DOWN and UP simultaneously. 
 To exclude a parameter from the MMSP register: 
- with DOWN and UP buttons choose  the parameter to be excluded; 
 - push buttons DOWN and UP simultaneously. 
When a parameter is excluded form the MMSP mode register, a decimal point glows in the higher digit position 
of the mnemonic indicator. 
 
2.2.6  Restoring factory settings. 
There are two ways to restore the factory settings. 
Way 1. Set up parameter 
=1. Upon exit from the parameter setup mode all factory settings will be restored 
(except the Service Engineer Password). 
Way 2. 
When powering ОМ-310  on, hold down SETUP and RES/MEM/SEL buttons for 2 seconds. All factory 
settings including the Service Engineer will be restored (Service Engineer password – 123). 
After completion of the factory settings setup, ОМ-310 will start operation in MMSP mode, which  includes the 
following parameters: 
- CT type (external or integral);
; 
- CT rated current (set in case of external CT); 
; 
- rated power of load, 
. 
 
 
2.3 OM-310 PRE-OPERATION PROCEDURE 
2.3.1 When operating with load power ranging from 3 kW to 30 kW, use of built-in current transformers is al-
lowed. The mains leading to the load must be conducted 
through openings in ОМ-310 casing (each phase wire 
uses a separate opening). 
When using other capacity loads, current transformers with 5A rated output current shall be connected in accor-
dance with Fig 2.1. For correct OM-310 operation, the current transformers’ polarity must be observed. 
 2.3.2 Run all three power phase cables through differential current transformer (zero sequence transformer) 
and connect the DCT to ОМ-310. 
2.3.3 Connect ОМ-310 to power mains in accordance with figure 2.1. 
2.3.4 To opera
te ОМ-310  via PC as control or monitoring device with use of “ОМ-310 Control Panel” software: 
  - 
install “ОМ-310 Control Panel” software to your PC by running setup_UBZ314.msi application; 
  -
connect “ЭВМ” (PC) connection plug on ОМ-310 front panel to RS-232 plug on PC with use of KC-01  cable 
or to USB jack of PC via KC-USB-01 cable; 
 -set parameter “
=1”. 
 
N o t e 1 - “setup_ UBZ-
ОМ.msi” software can be downloaded from Novatek-Electro website 
N o t e 2 - 
КС-01, KC-USB-01 cables are optional and can be ordered separately. Users can make KC-01 cable 
themselves following the diagram shown in Fig. 2.2.  
N o t e 3 - Custom-developed softwa
re can also be used to operate ОМ-310 .  
 
2.3.6 When using MODBUS, connect communication lines to terminals 33, 34, 35 of. Set “
=2” parameter.  
2.3.7  Energize 
ОМ-310.  
 
N o t e - 
ОМ-310 is supplied with rated load power set equal to zero. In this case the ОМ-310 load relay 
will not close before the rated load power is set up. 
 
Load relay closing sequence is controlled by 
 
и  (par. 2.4.1.) parameter values.   
2.3.8  Set up required parameter values in the menu.  
2.3.9 De-energize 
ОМ-310. 
2.3.10 Connect the load magnetic contactor (further referred to as MC) according to Fig 2.1.  
 
N o t e -  When the load relay is energized, contacts 5-6 and 8-9 are closed, when the relay is de-energized, 
contacts 4-5 and 7-8 are closed.