Utica Boilers CuB Series Installation Instruction

Page of 4
Check our website frequently for updates: www.ecrinternational.com
10. 
See Installation, Operation & Maintenance Manual for 
adjusting DHW tank temperature and operation. 
11. 
Resume operation using Installation, Operation & 
Maintenance Manual.
12. 
Verify proper operation by following START UP 
PROCEDURE in Installation, Operation & Maintenance 
Manual.
13. 
Install front cover.
DOMESTIC HOT WATER SENSOR KIT
 
DOMESTIC HOT WATER SENSOR 
KIT    FOR  CHB-100  &  CHB-130                        
#550002958
DESCRIPTION
PART #
QTY
DHW Tank Sensor
-
1
Clip
-
1
Thermopaste
1
Instructions
240010745
1
Figure 4 - Wiring Diagram
Remove both resistors. 
Wire sensor to 7 and 8.