Siemens TV Converter Box G120 User Manual

Page of 147
 
 
 
 
 
 
 
    
Automation and Drives - SCE 
 
 
 
 
T I A  Training Document
 
Page 144 of 147 
 Module  
 
     H01 
Issued: 02/2008 
  Frequency Converter SINAMICS G120 on PROFIBUS DP and PROFINET 
Preface         Notes         Startup with PROFIBUS         Startup with PROFINET         Program Example 
6.5 
Generating Function FC10 to Control the Bucket Elevator 
 
8.  Generate an FC10 , enter the following networks and save the FC10. (
→ 
 
 
 
Bucket Elevator 
Move bucket elevator upward 
"Mem-downward“ 
 
"Stop“ 
 
“B5_at top“ 
 
“Auto/Inch“ 
“Upward“
         “Upward“
"Upward“ 
 
"Auto/Inching“ 
 
“Stop“ 
 
“B5_at top“ 
 
“F_downward“ 
     “F_Upward“
 Network 2
:  Conveying Speed
                “F_upward“ 
 
         
“Control_ 
 Converter“ 
 Main Setpoint 
    Network 3:  Braking phase at top
  “B7_BrakeAtTop“ 
 
 
 
  “Status_Converter“ 
  Right_Left 
    “Mem Upward“
“Control_ 
Converter“ 
Main Setpoint 
“Mem_SlowUpw“
        “B5_at top“