Siemens TV Converter Box G120 User Manual

Page of 147
 
 
 
 
 
 
 
    
Automation and Drives - SCE 
 
 
 
 
T I A  Training Document
 
Page 145 of 147 
 Module  
 
     H01 
Issued: 02/2008 
  Frequency Converter SINAMICS G120 on PROFIBUS DP and PROFINET 
Preface         Notes         Startup with PROFIBUS         Startup with PROFINET         Program Example 
 
 
 
 
 
Network 4 : Move elevator downward
 “Mem-
Upward“ 
 
 “Stop“ 
 
“B4_at bottom“ 
 
 “Downward“ 
 
 “Auto/Inching“
 
“Stop“ 
 
“B4_at bottom“
 
“F_Upward“ 
“Downward“
“Mem-Downw“
“F_Downward“
“Control_Converter“
     Main Setpoint 
Network 5 : Maximum Speed 
“Control_Converter“
       Right_Left 
“Control_Converter“ 
     Main Setpoint 
“F_downward“ 
“Mem_SlowDownw.
Network 6 : Braking Phase at Bottom 
 “B6_BrakeBottom“ 
 
 
 “Status_Converter“ 
      Right_Left 
 
Network 7 : Bucket Elevator Start/Stop 
“B4_bottom“ 
“Mem_SlowDownw
“Control_Converter“
“F_Upward“ 
 
“F Downward“