Maintenance 
Periodic maintenance 
Perform periodic inspections to ensure that the HP POD 240e NA continues to perform according to design 
parameters. During periodic inspections, pay special attention to electrical connections and wiring. 
You are responsible for creating and performing detailed preventative maintenance based on HP 
recommendations. Data sheets or additional operation and maintenance manuals will be provided for this 
task. 
  
 
CAUTION: 
 Failure to implement a comprehensive preventative maintenance schedule may result 
in reduced efficiency in the HP POD 240e NA, failure of main or subsidiary systems, and loss of 
warranty on third party components. 
For more specific maintenance information, see the HP Performance Optimized Datacenter 240e NA 
Maintenance and Service Guide
 
Preparing the Adiabatic units for winter 
 
 
CAUTION: 
 Because the Adiabatic units use water, you must take extra precautions during the 
winter months to establish safe operating conditions of the HP POD 240e NA. 
  
 
IMPORTANT:
  HP recommends contacting your HP representative prior to winterizing your HP 
POD 240e NA for further instructions. 
  
There are three major processes that you must complete to winterize the HP POD 240e NA Adiabatic units. 
Complete the following processes in the following order: 
1. 
Supply header gravity drain (on page 
2. 
Adiabatic unit by unit blowdown (on page 
) 
3. 
Supply header blowdown (on page 
) 
Your site or POD might have different component locations or a different number of Adiabatic units. 
You will need the following items to winterize the Adiabatic units: 
 
Air hose adapter—Connects the house air or compressor to the supply header. 
 
Adiabatic unit splash deflector—Used inside of each Adiabatic unit to prevent unnecessary splashing.   
This splash deflector consists of a hose barb adapter and enough flexible tubing to direct water to the 
drain.