Power, electrical, and controls 25
Top view shown
The top of each electrical panel has four 10.16 cm (4 in) welded couplings where the power feeders are
connected.
Power feeders are sized in accordance with NEC and IEC regulations.
connected.
Power feeders are sized in accordance with NEC and IEC regulations.
Electrical panels
WARNING:
To avoid the risk of personal injury or loss of life, all personnel must comply with PPE
requirements when opening or working inside areas of the HP POD 40c G2 that are marked as
hazardous voltage, per NFPA 70E in accordance with NEC (NA) and IEC (EMEA and APJ).
hazardous voltage, per NFPA 70E in accordance with NEC (NA) and IEC (EMEA and APJ).
WARNING:
To avoid the risk of personal injury or loss of life, all personnel must comply with
electrical warning labels when operating and maintaining the electrical panels and systems of the
HP POD 40c G2.
For the external electrical power component locations, see "Electrical power component identification (on
)."
Main breaker locations