Appendix A: HP site assessment  25 
Appendix A: HP site assessment 
HP POD 240e NA site assessment checklist 
During a survey of the readiness of a proposed customer site for the HP POD 240e NA, the site is inspected 
for the following: 
 
Accessibility of machinery for the transportation and installation of the HP POD 240e NA 
 
Assessment of the suitability of the site infrastructure for installing the HP POD 240e NA and for 
supporting infrastructure preparation and serviceability requirements 
HP responsibilities 
 
Item 
Description 
Yes  No  N/A  Initial 
1. Engagement plan  Develop an engagement plan with specific requirements 
relating to the proposed installation site. 
 
 
 
 
2. Site visits 
Schedule site visits on mutually acceptable dates, during 
normal HP business hours. 
 
 
 
 
3. Test equipment 
Document any test equipment that is required for installation 
or commissioning. 
 
 
 
 
4. Installation site 
review 
Review and discuss the proposed installation site: 
 
Physical examination of the proposed installation site. 
 
At HP's discretion, include physical measurements of the 
area. 
 
 
 
 
5. Indoor/outdoor 
installation 
Determine if the HP POD 240e NA installation is indoors or 
outdoors. 
 
 
 
 
6. Site pad 
Inspect the proposed installation site to be sure that the 
customer is aware of the following requirements: 
 
POD load pads are in the proper location. 
 
Upon installation, the POD structure must be leveled to  ≤ 
0.5º, which can be checked at that time with a surveyor’s 
transit. 
 
Shimming is allowed at the load pads only. 
 
Place shims in increments across the load pads to be sure 
that there is sufficient load transfer. 
 
 
 
 
7. Construction site 
inspection 
Visually inspect the construction site and identify the location 
to install the crane.  
 
 
 
 
8. Staging 
Be sure the following areas exist and are identified: 
 
Truck delivery 
 
Staging 
 
Waste removal 
 
 
 
 
9. Clearances 
Inspect the proposed installation site to confirm the clearance 
requirements are met for installing and servicing the POD 
based on the HP POD 240e NA specifications. Consider 
future planning for the space around the installation site. 
 
 
 
 
10. Support 
infrastructure 
location 
Evaluate the HP POD 240e NA installation site in relation to 
the existing and planned support infrastructure location.