HP Performance Optimized Data Center (POD) 240a Quick Setup Guide

Page of 39
 
Overview  6 
 
 
As part of the overall certification, relevant sections of the International Building Code have been 
applied as part of the design and evaluation. The current design supports wind loads up to 90 mph. 
 
Site assessment 
HP requires a detailed site assessment before planning and preparing your site location for the HP POD 
240e NA. Consult with HP to schedule a site assessment. 
 
Site preparation 
Site preparation must be complete before the delivery of the POD for a timely installation and commissioning. 
The site must meet all pad and power requirements. 
 
Site safety and security 
Your site must have its own standard safety and security requirements. HP Program Managers will work with 
you to verify adherence to the appropriate precautions. HP is not responsible for determining or enforcing 
safety or security requirements. You must conduct all health and safety evaluations of the HP POD 240e NA. 
HP is available to help you be sure that you have successfully conducted these evaluations. 
 
Fire detection 
The fire detection system is supplied as a component of the HP POD 240e NA, and is Manufacturer Designed 
specifically for this HP product, in compliance with national standards. 
HP does not certify that the fire detection system that is installed in the HP POD 240e NA meets all local and 
jurisdictional requirements. The customer is responsible for the following actions: 
 
Verifying that the POD fire detection system meets local codes, including specific local requirements for 
initial and periodic inspections 
 
Arranging for and receiving all required local permits, including initial commissioning as well as 
standard and repair maintenance 
 
General maintenance of the fire detection system must be completed by an authorized technician 
For more information, see the HP Performance Optimized Datacenter 240e NA Maintenance and 
Service guide
Any additional local requirements are not covered as part of the installation and deployment services of the 
fire detection system, unless specifically included in an executed SOW. 
 
Capacities 
Each HP POD 240e NA is unique and the specific power and cooling capacities will vary for each POD that 
uses Adiabatic cooling. For specific capacity information, see your HP Performance Optimized Datacenter 
240e NA Customized Supplement