FMC Corporation - Talstar 80 User Manual

Page of 122
Commissioning
Proline Promass 80 PROFIBUS PA
46
6
Commissioning
6.1
Function check
Make sure that the following function checks have been performed successfully before switching on 
the supply voltage for the measuring device:
• Checklist for "Post-installation check" 
• Checklist for "Post-connection check" 
6.2
Switching on the measuring device
Once the function check has been performed successfully, the device is operational and can be 
switched on via the supply voltage. The device then performs internal test functions and the 
following messages are shown on the local display:
Normal measuring mode commences as soon as startup completes.
Various measured value and/or status variables appear on the display (HOME position).
!
Note! 
If startup fails, an error message indicating the cause is displayed.
 PROMASS 80
 START UP…
Start-up message
 DEVICE SOFTWARE
 V XX.XX.XX
Current software version 
 SYSTEM OK
 
 OPERATION
Beginning of normal measuring mode