Bowers & Wilkins CWM3 User Manual

Page of 56
6. Using a Back-box Kit
Custom install back-box kits comprise a fire-proof 
box that can be fitted behind in-wall or ceiling 
speakers before the sheetrock (plasterboard) is fitted 
to the studs (joists). As well as enabling compliance 
with fire regulations, back-boxes also help optimise 
speaker performance by providing a defined acoustic 
loading volume. A minimum clearance depth of 
90mm from the outer stud (joist) plane to any rear 
obstruction is required to fit a back-box.
Back-boxes incorporate holed side flanges that are 
intended to be nailed to adjoining studs (joists). All 
the nail holes should be used to help minimise the 
risk of the flange vibrating against the stud (joist) 
when the speaker is in use.
Speaker cable is bought into back-boxes via sealing 
glands. Once the cable has been brought through 
the gland, and the gland tightened, fire-retardant 
sealing mastic should be used to seal the assembly. 
Ensure that a generous length of cable is available 
in the back-box before the gland is sealed. A cable 
clamp adjacent to the gland provides cable strain 
relief.
When the sheetrock (plasterboard) is fitted over the 
back box a generous bead of fire-retardant sealing 
mastic should be applied to the back box flanges 
in order to seal the assembly and minimise the 
possibility of vibration when the speaker is in use.
Diagrams 10-12 illustrate back-box installation.
6
E
N
G
L
IS
H
Diagram 10 
Back-box stud (joists) installation 
Diagram 11 
Cable installation
Diagram 12 
Sheetrock (plasterboard) installation