Panasonic Attune II Installation Guide

Page of 84
21
Installation procedures

wDeciding on where to install the Center Module
Select a wall on which to mount this unit, drill a hole in it to pass the wires through, and decide where the four screws are to be 
positioned, as shown below.
190
135
25
40
200
5

p Ensure that the installation surface has the pull-out strength below.
Important

w Installation

Mount this unit using the accessory wall mounting bracket and 4 screws (4.1  mm × 25 mm  
{5/32 inches × 63/64 inches}).  
[Minimum pull-out strength: 780 N {80 k
Jf}]
Screws (locally procured)
(wood screws:  
4.1  mm × 25 mm 
 {5/32 inches × 63/64 inches})
Wire channel
English