Mercury PR0091 User Manual

Page of 21
 
Mercury 6-5 Stat – Installation & User Guide
 
Connections 
 
All connections are made to the back of the controller. The diagram below shows the connection detail. Inputs 
and outputs are assigned according to the chosen configuration. See 
connections. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Do not connect an earth
 
 
 
Input/Output Allocation Tables 
 
An over-ride can be achieved by switching in a fixed value resistor in parallel with the probe inputs as shown 
in the table below. 
 
5 Ch Thermostat 
Description 
Alarm Action 
(Switched Resistor)* 
Input 1 
Probe 1 and Over-ride 1 
Yes 
Over-ride signal 1 
Input 2 
Probe 2 and Over-ride 2 
Yes 
Over-ride signal 2 
Input 3 
Probe 3 and Over-ride 3 
Yes 
Over-ride signal 3 
Input 4 
Probe 4 and Over-ride 4 
Yes 
Over-ride signal 4 
Input 5 
Probe 5 and Over-ride 5 
Yes 
Over-ride signal 5 
Relay 1 
Thermostat Channel 1 
N/A 
 
Relay 2 
Thermostat Channel 2 
N/A 
 
Relay 3 
Thermostat Channel 3 
N/A 
 
Relay 4 
Thermostat Channel 4 
N/A 
 
Relay 5 
Thermostat Channel 5 
N/A 
 
 
* For PT1000 probes use 820 Ohm  
 
Ensure that all power is 
  For NTC2000 and NTC2k25 probes use 590 Ohm 
 
 
 
switched off before   
installing or maintaining 
this product 
  
Revision 1.2 
Page 4 of 21