Fire Magic 42VH6 Installation Instruction

Page of 26
REV 2 - 1406051400
L-C2-387
19
Custom Soffi t:
Construct the soffi t frame according to your individual 
install preference, while following the guidelines found in 
the INSTALLATION REQUIREMENTS section.
When designing the soffi t; account for the thickness of your 
fi nishing substrate so that overall dimensions are fl ush 
with the vent hood and spacer below. The soffi t must allow 
permanent interior access (i.e. access panel/door). 
1.  Locate and mark the REAR WALL studs.
2.  Using appropriate mounting hardware for the soffi t  and 
rear wall construction; secure it into the rear wall. The 
soffi t will rest directly above the spacer and vent hood.
Important:  THE SOFFIT MUST BE SECURED INTO 
MULTIPLE WALL STUDS, USING THE 
APPROPRIATE HARDWARE, TO ENSURE 
PROPER SUPPORT. METAL FRAMEWORK 
WILL REQUIRE ADDITIONAL WALL 
STUDS AND SCREWS FOR PROPER 
SUPPORT. CONSULT A PROFESSIONAL 
CONTRACTOR FOR YOUR INDIVIDUAL 
SETUP.
3.  Install fi nishing substrate to left and right sides, and 
front of soffi t as appropriate.
Important:  The soffit must allow permanent interior 
access (i.e. access panel/door).
INSTALLATION (cont.)
Fig. 19-1 Custom soffi t orientation
• Soffi t must be properly secured 
into REAR WALL studs.
• Soffi t must have access panel/
door.
R O O F
R
E
A
R
W
A
L
L
(remove grill 
if possible)
S
O
F
F
I
T