Southbend SB1059F User Manual

Page of 140
PREPARATION
For Machines Mfg. Since 3/11
EVS Toolroom Lathe w/DRO
-21-
P R E P A R A T I O N
Preparation Overview
Things You'll Need
To complete the preparation process, you will 
need the following items:
For Lifting and Moving
s
!
s
,IFTING
s
'UIDE
s
Two other people for assistance when moving 
machine
s
Hardwood blocking (see Page 27)
For Power Connection
s
A power source that meets the minimum 
circuit requirements for this machine (review 
the Power Supply Requirements section 
on the next page for details)
s
An electrician or qualified service personnel 
to ensure a safe and code-compliant 
connection to the power source
For Cleaning & Assembly
s
Cotton rags
s
Mineral spirits
s
Quality metal protectant oil
s
3AFETY
s
Wrench or socket 21mm
s
Wrench or socket 19mm
s
&LOOR
s
0RECISION
s
Standard screwdriver #2
The purpose of the preparation section is to help 
you prepare your machine for operation. The list 
below outlines this basic process. Specific steps 
for each of these points will be covered in detail 
later in this section.
The typical preparation process is as follows:
1.
  Unpack the lathe and inventory the contents 
of the box/crate.
2.
  Clean the lathe and its components.
3.
  Identify an acceptable location for the lathe 
and move it to that location.
4.
  Level the lathe and either bolt it to the floor 
or place it on mounts.
5.
  Assemble the loose components and make 
any necessary adjustments or inspections to 
ensure the lathe is ready for operation.
6.
  Check/lubricate the lathe.
7.
 
Connect the lathe to the power source.
8.
  Test run the lathe to make sure it functions 
properly.
9.  Perform the spindle break-in procedure to 
prepare the lathe for operation.