ACR Electronics 1933 User Manual

Page of 16
Y1-03-0232D 
Mounting 
Both  the  surface  mount  and  the  flush  mount  options  require  access  to 
the  backside  of  the  mounting  location.  Verify  that  there  are  not  any 
obstructions  behind  the  area  where  the  switch  is  to  be  located,  e.g., 
bulkheads, wires, plumbing or hardware. Check that the coax cable from 
the Master Controller can be routed to this location. Generally, the Point 
Pad™ should be mounted in a protected area.  
 
Surface Mount 
Install the surface mount Point Pad
™ by drilling 
three  (3)  holes  in  the  dashboard  location  using 
the  Point  Pad
™  Surface  Mount  Template 
supplied in the Mounting Templates. Mount  the 
Point  Pad  to  the  dashboard  using  the  gasket, 
washers  and  nuts  supplied.  Apply  a  sealant 
around  the  bolt  holes  to  protect  from  moisture 
intrusion.  
 
 
 
 
Flush Mount 
When  the  flush  mount  is  selected,  cut  a 
rectangular  hole  in  the  dashboard  location  using 
the Point Pad™ Flush Mount Template supplied in 
the Mounting Templates. Use the gasket, washers, 
nuts and the two U-Clamps provided to secure the 
Point Pad™. Apply a sealant around the cut out to 
protect from moisture intrusion.  
 
 
 
Connecting to the Master Controller 
The Point Pad
™ communicates with the Master Controller via standard 
television  type  RG-59  coaxial  cable. 
The  connectors  are  standard  “F” 
type  television  connectors.  The  connector  on  the  back  of  the  Point 
Pad
™ is located in the center of the panel for ease of installation. After 
the coax cable has been routed and the “F” connector is attached to the 
coax  cable,  screw  the  “F”  connectors  to  the  Master  Controller  and  the 
Point Pad™.  
 
Additional Point Pads™ (up to three) may be used with one (1) Master 
Controller. A standard 
“T” connector or RG-59 television type splitter is 
used  for  each  additional  Point  Pad™.  Limit  the  total  length  of  all  coax 
cable used to 300 feet.