1.  HOW TO INSTALL THE SYSTEM
1-13
1.6
IF Unit
Refer to the outline drawing at the back of this manual for mounting dimensions. Fas-
ten the unit with 5x20 self-tapping screws. If the unit is to be installed on a bulkhead, 
be sure that the location does not allow water to drip into the cable entrance.
1.7
Grounding the Equipment
Ground the equipment referring to the table shown below.
1.8
Attachment Flange (option)
The attachment kit permits use of the retraction tank for the CSH-20 series using the 
1200 mm stroke transducer.
Attachment flange (Type: OP10-27. Code No. 000-067-050)
1. Clean the flange and O-ring groove of the retraction tank (welded to hull) with ethyl 
alcohol moistened waste cloths. Coat O-ring and O-ring groove with lithium 
grease. 
2. Place the O-ring in position on the retraction tank flange.
3. Coat the threads of the bolts with a slight amount of lithium grease to prevent 
scorching.
4. Fix the attachment flange to the retraction tank with flat washers, spring washers 
and hex nuts.
To install the attachment flange and hull unit, see section 1.1.3.
Unit
Ground wire
Remarks
Hull Unit
IV-8sq
Local supply (protective ground)
Processor Unit
IV-8sq
Local supply
IF Unit
IV-2sq
Local supply
Control Unit
IV-1.25sq
Local supply
Transceiver Unit
Copper strap
Standard supply
Junction Box (option)
Copper strap
Local supply
Name
Type
Code No.
Qty
Attachment Flange
10-077-5802
100-303-610
1
O-ring
CO 0318A(V585)
000-166-370-10
1
Hex. Nut
M20 SUS304
000-863-116
48
Flat Washer
M20 SUS304
000-864-136
24
Spring Washer
M20 SUS304
000-864-270
24