3com TR User Manual

Page of 126
Installing the Slide-in Modules
2-3
Configuration Guidelines
The cable topology rules for Token Ring are shown 
below:
Power Supply and Fuse
The Switch 2000 TR automatically adjusts to the sup-
plied voltage. The fuse is suitable for either 90-110V 
A.C. or 220-240V A.C. A spare fuse is provided in the 
fuse drawer.
Replacing the Fuse
Refer to Figure 2-1 for the location of the fuse. When 
necessary, replace the Switch 2000 TR fuse with a 
fuse that has the following specifications:
250 volts — 4A Slo-Blo
1
Power down the Switch 2000 TR by removing the AC 
power cord or the Redundant Power System cords.
2
Gently pry open the fuse holder cover with a small 
flat-blade screwdriver.
Figure 2-1   Switch 2000 TR Fuse Location
3
Slide out the fuse holder drawer and remove the fuse.
4
Install the replacement fuse and close the fuse 
drawer.
5
Re-insert the power cord and apply power.
Installing the Slide-in Modules
This section explains how to install the three optional 
modules into a SuperStack II Switch 2000 TR device. 
The modules are:
ATM
FDDI
TR-in-FE
Media
4 Mbps
16 Mbps
Category 3 UTP
 660 ft/200m
330 ft/100m
Category 4, 5 UTP
 1,320 ft/400m
660 ft/200m
Type 1 STP
 2,000 ft/600m
1,000 ft/300m
Fuse location
AC connector