Schneider Electric ACECFR40101SE Manual De Usuario

Descargar
Página de 32
EcoBreeze System Installation
16
Remove the tension rods
Tension rods are installed diagonally across each Module bay to provide support during 
shipping. 
1. Release tension on the rods by loosening the nuts on the ends of the tension rods. 
2. Using an
 
M12 wrench, remove the eight bolts securing the tension rod brackets. 
3. Remove the tension rods and brackets. 
WARNING
DAMAGE TO EQUIPMENT OR PERSONNEL
•  Loosen the nuts on the ends of the tension rods to relieve tension before removing 
tension rod brackets.
•  Do not remove the tension rods until EcoBreeze Frame is placed and secured on 
its supports. 
•  Move the EcoBreeze Frame directly from the truck to its permanent foundation or 
supports. If it must be stored temporarily, it must be placed on a flat and level 
surface to avoid damage. 
Failure to follow these instructions can result in death, serious injury, or 
equipment damage.
na3450a
SUPPLY
BLOWER
ACCESS
COIL
ACCESS
SUPPLY
BLOWER
ACCESS
COIL
ACCESS
SUPPLY
BLOWER
ACCESS
COIL
ACCESS
SUPPLY
BLOWER
ACCESS
COIL
ACCESS