FRONT MOUNTING BRACKET MUST BE INSTALLED TO A 
STRUCTURAL SUPPORT (STUD) ON THE HEADER WALL.  
FAILURE TO DO SO COULD CAUSE SENSING SYSTEM TO 
MALFUNCTION, RESULTING IN ENTRAPMENT, INJURY OR 
DEATH.  REINFORCE HEADER IF NECESSARY USING A 
2 x 6 AND LAG SCREWS (NOT PROVIDED). 
 
  
 
WARNING 
STEP 1:  
Mounting the Front Bracket — Sectional 
Doors and One-Piece Doors with Track:  Mark a 
vertical centerline on the header above the door.  By 
manually raising the door, determine the high arc of the 
door’s travel (see illustrations on page 4 ) and using a 
level, transfer this measurement to the header  (see 
illustration at left).  Draw a horizontal line, crossing the 
previously drawn centerline, at this point.  Install the 
Front Mounting Bracket securely with the lag screws as 
illustrated below.  If necessary, reinforce the header with 
steel angle iron or wood to ensure a secure mount. 
Mount the Front Mounting Bracket securely with lag screws as 
shown in figure below.  If necessary, reinforce the header with 
steel angle iron or wood to ensure a secure mount. 
NOTE:  Since the opener will  be secured permanently 
in this position, open and close the door a few times to 
be sure the door does not rub on the Tee Rail and that 
you have allowed the proper clearances before 
proceeding.  
STEP 4:  
Mount Power 
Head to Ceiling:  Since 
there is such variety in 
ceiling structures, all the 
mounting possibilities for 
the Power Unit cannot be 
illustrated here.  The 
main concern is 
mounting the Power Unit 
securely to the ceiling 
joists for operational strength, rigidity and safety.  
Although there are a series of mounting slots provided 
on the power unit, try to secure the hanger angle in 
the slots closest to the front.
  Mounting may usually 
be accomplished using standard 1-1/4“ perforated steel 
angle available at most hardware stores.  If in doubt 
HORIZONTAL 
LINE 
104369 
 
   
VERTICAL 
   CENTERLINE 
STEP 2
 Raise the Tee Rail so that the Front Idler 
Bracket and Front Mounting Bracket align.  Insert bolt 
and tighten nut loosely for now.  Later in the 
installation, this nut must be tightened securely.  
 
STEP 3 — 
Sectional 
Doors and One Piece 
Doors  with Track:  Raise 
the Opener and rest the 
Power Unit on a ladder or 
other sturdy support.  Open the door to the full open position.  Allow 
2" of space between the Tee Rail and the top section of the door (as 
shown in the below left illustration).   
104372 
LAG SCREWS 
5/16” X 1-7/8” 
HIGH ARC (RISE) 
HORIZONTAL LINE 
VERTICAL 
CENTERLINE 
104371 
 INSTALLING THE OPERATOR