Hampton Direct H35-NG1 Manual De Usuario

Descargar
Página de 48
20
Hampton
®
 H35 Direct Vent Freestanding Gas Stove
Alternate 
Horizontal 
Termination Caps
Dura-Vent Basic 
Horizontal Kit # 970
1 90
o
 Elbow
1 Wall 
Thimble 
Cover
1 Horiz. 
Sq. 
Term. 
Cap
INSTALLATION
DURA-VENT TERMINATION KIT
Planning Your Dura-Vent 
Installation
There are two basic types of Dura-Vent Direct 
Vent System installations: horizontal termination 
and vertical termination. Confi rm the maximum 
horizontal run and maximum vertical rise from the 
diagrams in the "Venting Arrangment" section.
When planning your installation, it will be nec-
essary to select the proper length of vent pipe 
for your particular requirements. For horizontal 
installations, determine the minimum clearance 
from the rear of the unit to the wall. It is also 
important to note the wall thickness.  (The wall 
thimble is suitable for 2 x 4 or 2 x 6 wall construc-
tion.) Select the amount of vertical rise desired for 
"vertical-to-horizontal" type installations.  
Warning:  Always maintain required 
clearances (air spaces) to nearby 
combustibles to prevent a fire 
hazard. Do not fi ll air spaces with 
insulation. 
The minimum clearance requirements between 
the outer wall of the vent pipe and nearby com-
bustible surfaces is 1-1/4 inch. Be sure to check 
the vent termination clearance requirements from 
decks, windows, soffi ts, gas regulators, air sup-
ply inlets and public walkways as specifi ed in 
the "Exterior Vent Terminal Locations" section 
and in your local building codes.
To determine the length of vent pipe required 
for vertical installations, measure the distance 
from the unit fl ue outlet to the ceiling, the ceiling 
thickness, the vertical rise in an attic or second 
storey, and allow for suffi cient vertical height 
above the roof line. 
For multi-storey applications, fi re stops are 
required at each fl oor level. If an offset is 
needed, additional pipe, elbows and supports 
will be required.
Do not exceed the maximum number of elbows.  
One 90
o
 for horizontal terminations and two 
45
o
 for vertical termination.