Bradford-White Corp E32-80R Manual De Usuario

Descargar
Página de 12
Instructions for Conversion of Commercial Electric Models 
 
 
6
Voltage Conversion 
 
1.  Voltage conversion is accomplished by replacing the existing elements with elements that are rated 
at the required voltage. 
 
2.  To accomplish this conversion refer to the above procedure for KW Conversion ---- Element 
Changes. 
 
3.  Execute steps 1 thru 8 of that procedure. 
 
Control Box Conversion  
 
NOTICE 
Control box conversion is ONLY required when converting water heater 
to 18Kw 208v (Kit # 265-43942-18). 
 
1.  Open front panel of control box installed on water heater and disconnect the (6) load wires from fuse 
blocks. 
 
2.  Remove (4) screws joining control box to water heater and remove control box. 
 
CAUTION 
Use caution to not damage any of the wire insulation when removing 
control box. 
 
3.  Install new control box onto the water heater by feeding the wires through the back of the control box 
and reinstall (4) mounting screws. 
 
4.  Reconnect wires to new fuse blocks. Be certain to match wire colors to Line side of fuse blocks.  
 
Figure 2.  Example of control box removal/installation. 
Control Box 
Wire Harness 
(Load wires)