Start-up Procedure 
 
 
-72-
 
Verify Inlet Shut-off Valve Operation (if installed) 
Step 11:  If the Inlet Shut-off Valve is installed, the valve will open during the Start-up Sequence.  Verify 
that the valve is open by drawing water from a faucet (specifically hot water).  This is shown in Figure 111.  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Program the Setback Control (if installed) 
Step 12:  Refer to the instructions included with the Setback Control on how to program the control.   
 
 
 
 
 
 
 
 
 
 
The Start-up Procedure is complete.  The installation of the Accessory 
Module and its components is complete. 
 
 
 
 
 
 
 
 
 
 
 
 
Figure 111