American Water Heater BCL3 95T199 6NOX Manual De Usuario

Descargar
Página de 52
27
seQuenCe of operation flow Chart
Description of this flow chart can be found in the “SeqUenCe OF OPerATIOn” section found on page 26.
Thermostat calls for heat
Switch power on to unit
VFD sends power to Blower
Blower engages Prover Switch
Blower runs at low speed 
After 30 seconds, Ignition 
Control provides power to 
Spark Igniter and opens Gas 
Valve
Ignition Control maintains spark for up 
to 4 seconds and monitors Flame 
Sensor to determine if Burner is lit
Does Burner 
light?
Ignition Control changes Blower from 
low speed to high speed after 5 seconds
Ignition Control monitors 
flame signal
Thermostat is satisfied
Blower – off; Blower Prover – opens
Ignition Control – off; Gas Valve – closes
Wait 15 minutes. 
Blower runs at 
low speed
Is this the third loss 
of flame signal?
Is this the third
ignition trial?
Loss of flame signal?
YES
YES
NO
NO
Gas Valve – off
Gas Valve – off
NO
NO
YES
YES
figure 24.