Maintenance Object Repair Procedures 
9-1330
PPP-PT (Control LAN Packet/Port) 
9
SCOTCH Synchronous Looparound Test (#1275)
This test is destructive.
This test verifies the circuit in the datapath of a ppp call. This test fails if the data 
transmitted on the port does not match the data received in the looparound 
mode. Failure of this test indicates a port hardware fault on the circuit pack.
2100
ABORT
Could not allocate the necessary system resources to run test.
1. Retry the command at 1-minute intervals, up to 5 times.
FAIL
Received tones do not match transmitted tones.
1. Retry command at 1-minute intervals, up to 3 times.
2. If the problem persists, refer to TDM-BUS, Tone Generator, and Tone 
Receiver repair procedures.
3. If the problem persists, replace the circuit pack.
PASS
Port connections across the TDM bus function properly.
Table 9-519.
TEST #1275 SCOTCH Synchronous Looparound Test 
Error 
Code
Test 
Result
Description/ Recommendation
1000
ABORT
The port is in use or PPP link is connected.
1. Determine when the port is available for testing (status clan-port 
UUCSSpp).
2. If necessary, busyout the circuit pack (busyout port UUCSSpp).
3. Retry the test (#1275) when the port is idle. 
1002
ABORT
No TDM bus timeslots available for the test.
1. Retry the command at 1-minute intervals, up to 5 times.
1963
ABORT
Firmware indicates that the port is in use or ppp link is connected.
1. Determine when the port is available for testing (status clan-port 
UUCSSpp).
2. If necessary, busyout the circuit pack (busyout port UUCSSpp).
3. Retry the test (#1275) when the port is idle. 
Continued on next page
Table 9-518.
TEST #1285 TDM Looparound Test  — Continued
Error 
Code
Test 
Result
Description/ Recommendation
Continued on next page