Cub Cadet SC2400 Manual De Usuario

Descargar
Página de 133
Sc2400 Operator’s Manual
10. 3-POINT HITCH
ALWAYS install an appropriate counterbalance to 
the front of the tractor, if necessary, when using a 3-
point hitch-mounted implement.
During transportation, put the 3-point hitch control / 
cutting height adjustment lever in its raised position 
and lock it with the position stop knob. Do not fully 
close the hydraulic flow control / stop knob.
ALWAYS use implements designed for a 3-point 
hitch. NEVER use unapproved implements with the 
3-point hitch. Contact your local Cub Cadet Yanmar 
dealer for technical assistance.
Avoid injury:
Make sure to stop the engine and then remove 
the key. Make sure that the engine has been 
stopped completely.
Make sure that no other parts are moving. If any 
part or component is still moving, wait until it 
comes to complete stop.
Installation / removal of an implement must be 
performed in a flat and solid place.
After the implement and the 3-point hitch have 
been installed, check for possible interference 
with the Power Take Off (PTO) shaft and other 
machine components. If interference is found, 
correct it.
(A) Rear-Power Take Off (PTO) shaft
(B) Left lift link
(C) Left lower link
(D) Sway links
(E) Right lower link
(F) Right lift link
(G) Top link retainer
(H) Top link
WARNING
1. Adjusting the 3-Point Hitch
CAUTION
3014910a
(A)
(C)
(D)
(H)
(G)
(F)
(E)
(B)