Harbor Freight Tools 68526 Manual De Usuario

Descargar
Página de 24
Item  68526  /  68529        
      Page 10
For Pump technical questions, please call 1-800-444-3353.
For Engine technical questions, please call 1-800-520-0882.
SAFETY
O
PERA
TION
M
AINTENANCE
SETUP
Using the Generator
Before Starting the Generator Engine
Before starting the engine:
a. 
Follow the Set Up Instructions to prepare the Generator.
b. 
Unplug all loads from the Generator.
c. 
Inspect the Generator and engine.
d. 
Fill the engine with the proper amount and type of both fuel and oil.
Basic Generator Use Procedure - See following pages for specific instructions
1.  Check that the generator can handle the wattage needed to power your products. 
2.  Start the Engine, and allow the Engine and Generator to run and warm 
up for five minutes after starting with no electrical load.
3.  Plug in products.
4.  When finished using the Generator, disconnect all electrical loads.
Note: Do not allow generator to run out of fuel with loads attached.  
5.  Turn off the Engine.
Allow the Generator and its Engine to completely cool.  Then store the unit in a clean, 
dry, safe location out of reach of children and other unauthorized people.
 
 
 
IMPORTANT:  After starting the engine, allow it to run at no load for five minutes 
with no load after each start-up so that the engine can stabilize.
6.  Break-in Period:
a.  Breaking-in the engine will help to ensure proper equipment and engine operation.
b.  The operational break-in period will last about 3 hours of use.  During this period:
•  Do not apply a heavy load to the equipment.
c.  The maintenance break-in period will last about 20 hours of use.  After this period:
•  Change the engine oil.
Under normal operating conditions subsequent maintenance follows 
the schedule explained in the SERVICE section.