GE PT878GC Manual De Usuario

Descargar
Página de 308
3-13
April 2004
Installing the PI Fixture and Transducers 
The PI clamping fixture holds transducers on pipes from 8 to 24 
in. in diameter. It comes with either a chain or strap, depending 
on the selection made with the initial order from GE Panametrics. 
To install the fixture and transducers, complete the following 
steps:
Surveying the Pipe
1. Measure the pipe circumference to an accuracy of ±2 mm  
(±1/16 in.) 
IMPORTANT: Do not use a calculated value or a nominal value 
for the circumference.
2. Tightly wrap the layout tape once around the entire pipe and 
line up the edges. Using the tape as a template guide for 
marks, mark scribe lines around the entire diameter of the 
pipe, as shown in Figure 3-13 below.
Figure 3-13:  Marking Circumferential Lines on the Pipe
3. Line up the zero scale of the layout tape at the desired location 
of the first transducer. (For a typical installation, this point 
will be the 3 o’clock position on a horizontal pipe.) Mark each 
of the two circumferential lines at the zero point. Connect 
each of these marks using a straight edge (for example, the 
edge of the layout tape) as shown in Figure 3-14 on the next 
page.