Section 3 – Post-Installation Start-up Adjustments
Recreational Vehicle Generator
 3.5   INSTALLATION CHECKLIST
LOCATION AND SUPPORT
 
‹
❑  Generator is properly located.
❑  Generator is properly supported.
❑  Generator is properly restrained.
GENERATOR COMPARTMENT
 
‹
❑  Compartment construction is proper.
❑  Holes/Openings are vapor-sealed.
❑  Compartment size is correct.
❑  Compartment is vapor-sealed.
❑  Sound insulation is correct.
❑  Floor cutouts are properly completed.
COOLING AND VENTILATING AIR
 
‹
❑   Airflow is adequate.
❑   Air inlet opening is correct.
❑   Compensate for restrictions.
❑   Check that installation has been tested.
GASOLINE FUEL SYSTEM
 
‹
❑  Fuel tank complies with all applicable codes.
❑   Fuel system is properly installed and checked 
for leaks.
OPTIONAL LP GAS FUEL SYSTEM
 
‹
❑   Fuel system is properly installed and checked 
for leaks.
❑   Pressure at regulator inlet is correct.
❑   Rated flow of primary regulator is correct.
❑   All parts are properly installed.
❑   Fuel system is properly tested/adjusted.
EXHAUST SYSTEM
 
‹
❑   Exhaust system complies with all applicable 
codes.
❑   Exhaust system is properly and safely installed.
ELECTRICAL CONNECTIONS
 
‹
❑   Connections comply with local code requirements 
and all National Electrical Codes.
❑  Junction box is properly installed.
❑  Wiring meets all standards.
❑   All connections are correct.
❑   Conduit is properly installed and sealed.
❑  Generator is properly bonded to the vehicle.
BATTERY INSTALLATION
 
‹
❑  Recommended battery is installed.
❑  Recommended cables are installed.
❑  Cables are clean and tight.
❑  Cables are connected properly.
❑  Proper ventilation is provided.
❑   Terminals are coated with anti-corrosion grease, 
and terminal covers are positioned.
OPTIONAL ACCESSORIES
 
‹
❑   Check that remote start/stop panels (if used) are  
installed properly.
❑   Check that hourmeter kit (if used) is installed 
properly.
❑   Check that any other options and accessories (if 
used) are installed properly.
POST INSTALLATION TESTS
 
‹
❑  Check that all tests are completed properly.
 
DATE OF INSTALLATION
 ____________________________________________________
 
NAME OF INSTALLER
 _______________________________________________________
 
SIGNATURE OF INSTALLER