Stripping the Ground Wire
Step 5
Slide the open end of a single 90° standard barrel, two-hole ground lug with 5/8-inch pitch over the 
exposed area of the 10-AWG wire.
Step 6
Using a crimping tool (as specified by the ground lug manufacturer), crimp the ground lug to the 10-AWG 
wire. (See 
Figure 3-11
Crimping a Ground Lug onto the Ground Wire
Step 7
Use the two nuts that were installed on the ground studs to attach the ground lug and wire assembly to 
the two ground studs on the rear of the appliance.
Step 8
Use a torque wrench to tighten each nut to 10 in-lb (1.12 N-m) torque.
Step 9
Connect the other end of the ground wire to a suitable grounding point at your site.
Proceed to the next section,“
,” to continue the installation.
Power Connections
To ensure the appliance chassis power connection is adequate, you will need the following parts and 
tools:
18-AWG copper wire for the power cord
Wire-stripping tool for stripping the 18-AWG copper wire
Number 2 Phillips screwdriver
Insulation
Wire lead
0.5 in. (12.7 mm) ± 0.02 in. (0.5 mm)
60528
60529