Creating Circuits and VT Tunnels
Options include node, slot, port, STS, and VT/DS-1. The options that display depend on the circuit type 
and circuit properties you selected in Step 3 and the cards installed in the node. For example, if you are 
creating a VT circuit or tunnel, only nodes with XCVT and XC10G cards are displayed. For Ethergroups, 
see th
.
Click Use Secondary Source if you need to create a UPSR bridge/selector circuit entry point in a 
multivendor UPSR. 
Step 7
Click Next
Step 8
In the Circuit Destination dialog box, enter the appropriate information for the circuit destination. If the 
circuit is bidirectional, you can click Use Secondary Destination if you need to create a UPSR 
bridge/selector circuit destination point in a multivendor UPSR. (To add secondary destinations to 
unidirectional circuits, see 
Step 9
Click Next
Step 10
Under Circuit Routing Preferences (
), select Route Automatically. The following options 
(described in detail in the next step) are available:
Using Required Nodes/Spans—If selected, you can specify nodes and spans to include or exclude in 
the CTC-generated circuit route.
Review Route Before Creation—If selected, you can review and edit the circuit route before the 
circuit is created.
Step 11
If you want the circuit routed on a protected path, select Fully Protected Path. Otherwise, go to 
Step 12. CTC creates a primary and alternate circuit route (virtual UPSR) based on the nodal diversity 
option you select: 
Nodal Diversity Required—Ensures that the primary and alternate paths within path-protected mesh 
network (PPMN) portions of the complete circuit path are nodally diverse. (For information about 
PPMN, see the 
.)
Nodal Diversity Desired—Specifies that node diversity should be attempted, but if node diversity is 
not possible, CTC creates link diverse paths for the PPMN portion of the complete circuit path.
Link Diversity Only—Specifies that only link-diverse primary and alternate paths for PPMN 
portions of the complete circuit path are needed. The paths may be node-diverse, but CTC does not 
check for node diversity.
Figure 6-2
Setting circuit routing preferences
Step 12
Click Finish or Next depending on whether you selected Using Required Nodes/Spans and/or Review 