Cisco ASR 9001 and Cisco ASR 9001-S Routers Hardware Installation Guide
OL-26701-02
Chapter 2      Unpacking and Installing the Chassis
Rack-Mounting the Router Chassis
Rack-Mounting the Router Chassis
The router chassis is installed in a front-mounted position, as shown in 
 for the 
Cisco ASR 9001 Router chassis.
In a front-mounted position, the chassis rack-mounting flanges are secured directly to the rack posts. 
The PID of the rack mounting kit for Cisco ASR 9001 Router and Cisco ASR 9001-S Router is 
ASR-9001-2P-KIT=.
Verifying Rack Dimensions
Before you install the chassis, measure the space between the vertical mounting flanges (rails) on your 
equipment rack to verify that the rack conforms to the measurements shown in 
.
Step 1
Mark and measure the distance between two holes on the left and right mounting rails.
The distance should measure 18.31 inches ± 0.06 inches (46.5 cm ± 0.15 cm).
Note
Measure the distance for pairs of holes near the bottom, middle and top of the equipment rack 
to ensure that the rack posts are parallel.
Step 2
Measure the space between the inner edges of the left front and right front mounting flanges on the 
equipment rack. 
The space must be at least 17.7 inches (45 cm) to accommodate the chassis, which is approximately 
17.45 in. (44.32 cm) wide, and fits between the mounting posts on the rack.
Figure 2-2
Verifying Equipment Rack Dimensions
Installing the Chassis in a 2-Post Rack
Two people must lift the router chassis using the handles on the sides. To accommodate racks with 
different hole patterns in their mounting flanges, the chassis rack-mounting flanges have three oblong 
screw holes on each side. 
Minimum usable
aperture 17.7 inches
(45.0 cm)
Hole centerline
to hole centerline
18.31 inches ± 0.06 inches
(46.5 cm ± 0.15 cm)
Mounting flanges
247170