Cisco Systems NPE-225 Manual De Usuario
C H A P T E R
9-1
Network Processing Engine and Network Services Engine Installation and Configuration
OL-4448-12
9
Removing and Installing the NPE or NSE
This chapter describes how to remove a network processing engine (NPE) or network services engine
(NSE) from supported platforms and also how to install a replacement network processing engine or
network services engine. This chapter provides instructions for the NPE-100 through NPE-400 and the
NSE-1. The NPE-G1 and NPE-G2 installation instructions are in
(NSE) from supported platforms and also how to install a replacement network processing engine or
network services engine. This chapter provides instructions for the NPE-100 through NPE-400 and the
NSE-1. The NPE-G1 and NPE-G2 installation instructions are in
. This chapter contains the following sections:
•
•
Note
This chapter describes the installation of all processors except the NPE-G1, the NPE-G2, and the
Cisco uBR7200-NPE-G1. For those processors, please see
Cisco uBR7200-NPE-G1. For those processors, please see
Ensuring Easy Access to the Router
If your Cisco 7200 VXR router or Cisco uBR7246VXR router is installed in a standard 19-inch, 4-post
or telco-type rack, cables from other equipment in the rack might obstruct access to the rear of the router.
Also, rack power strips or other permanent fixtures may obstruct access to the router. Review the
following guidelines to ensure easy access to the rear of the router when it is installed in a rack. If the
router is not installed in a rack, or if you already have clear access to the rear of the router, proceed to
the
or telco-type rack, cables from other equipment in the rack might obstruct access to the rear of the router.
Also, rack power strips or other permanent fixtures may obstruct access to the router. Review the
following guidelines to ensure easy access to the rear of the router when it is installed in a rack. If the
router is not installed in a rack, or if you already have clear access to the rear of the router, proceed to
the
Use the following guidelines to ensure easy access to the rear of the router when it is installed in a rack:
•
Ensure that you have at least 3 to 4 feet (0.91 to 1.22 meters) of working space at the rear of the
router.
router.
•
If cables from other equipment in the rack fall in front of the rear end of the router, carefully gather
the cables (using care not to strain or stress them) and use cable ties to anchor them away from the
rear of the router.
the cables (using care not to strain or stress them) and use cable ties to anchor them away from the
rear of the router.
•
If access to the rear of the router is partially blocked by a power strip or some other permanent rack
fixture, detach the router from the rack and carefully slide it forward until there is enough clearance
to remove the power supply, the network processing engine, and the subchassis from the router.
Detailed steps for detaching the router from the rack are contained in the
fixture, detach the router from the rack and carefully slide it forward until there is enough clearance
to remove the power supply, the network processing engine, and the subchassis from the router.
Detailed steps for detaching the router from the rack are contained in the